Partition & Ceiling Installation by its nature produces the most waste of any trade. Traditionally each component is bought oversized and cut on site to size. However if proper planning on the outset is engaged then all materials can be cut to size. Near eliminates waste. Cleaner site. Reduces demand on site logistics. Cranes, hoists etc. Minimises Labour as traditionally additional materials are brought in and waste has to be taken out. Speeds up installation tremendously. Improves Finish. Reduces Carbon Footprint. 8% less materials need to be produced and transported to site, minimises waste removal transport and waste management.